DISTRIBUTION AND TRANSMISSION NETWORK

GHANA PORTS AND HARBOUR AUTHORITYMAINTENANCE OF SUB-STATIONS

Client : Ministry of Energy and Petroleum
Period : 2016
Routine maintenance of the Ghana Ports and Harbour Authority (GPHA) transformer sub-station.

REPLACEMENT OF 161-Kv 150MVA TRANSFORMER

Client : CENIT Energy Limited
Period : 2015
Removal of damaged power transformer, reconditioning and installation of replacement of 161-kV 150-MVA power transformer and interconnection to iso-phase buses and HV switchgear.

DESIGN AND CONSTRUCTION OF A 5 km 161KV TRANSMISSION LINE

Client : CENIT Energy Limited
Period : 2012
Design and construction of a 161-kV transmission line for the power evacuation of a 126 MW power plant. The 161 kV line was construction and connected into the existing Bulk Supply Point at Tema for power transmission into the ECG and GridCO distribution and transmission network respectively.

FEED AND UPGRADE OF TEMA NEW SUB-STATION

Client : Volta River Authority
Period : 2006
FEED design and Due Diligence of the Tema New Substation which was constructed in early 1965. Works included a full due diligence of the substation and upgrades to the substation.

REHABILITATION AND UPGRADE OF 165 MVA TRANSFORMERS

Client : Volta River Authority
Period : 1998
Rehabilitate and upgrade 165 MVA power transformers at the Akosombo Hydro-Power Station, Ghana.